datatable.options.progress.min_duration¶
min_duration
min_duration
=
This option controls the minimum duration of a task to show the progress bar.
Parameters¶
return
float
Current min_duration
value. Initially, this option is set to 0.5
.
value
float
New min_duration
value. The progress bar will not be shown
if the duration of an operation is smaller than value
.
If this value is non-zero, then the progress bar will only be shown
for long-running operations, whose duration (estimated or actual)
exceeds this threshold.
The content on this page is licensed under the Creative Commons Attribution 4.0 License
(CC BY 4.0) ,
and code samples are licensed under the MIT License.